Load assessment and site survey
The inspection identifies access constraints, hidden defects and the information a tradesperson needs to price the work without avoidable provisional allowances.
Electrician service guide
Choose an EV charging installer who checks the incoming supply, cable route, mounting position and protection before promising a charging speed.
Typical project budget
£900–£1,800
Use this as a planning range only. Your property, region, specification and access determine the final quotation.
The inspection identifies access constraints, hidden defects and the information a tradesperson needs to price the work without avoidable provisional allowances.
Ask for this stage to be described in the written scope, including the materials, workmanship standard, access arrangements and what a finished result looks like.
Ask for this stage to be described in the written scope, including the materials, workmanship standard, access arrangements and what a finished result looks like.
Testing is documented at handover so you know what was checked, what standards apply and which certificates or maintenance notes you should retain.
Ask the tradesperson to define this allowance, its exclusions and the evidence they will provide at handover so every quote can be compared fairly.
Ask the tradesperson to define this allowance, its exclusions and the evidence they will provide at handover so every quote can be compared fairly.
Ask the tradesperson to define this allowance, its exclusions and the evidence they will provide at handover so every quote can be compared fairly.
Ask the tradesperson to define this allowance, its exclusions and the evidence they will provide at handover so every quote can be compared fairly.
Most can, but supply capacity, earthing and cable route need checking; a load-management setup may be recommended.
Usually not unless listed. Ask whether trenching, core drilling, reinstatement and long cable runs are included.
Use an appropriately qualified electrician and check any manufacturer or grant scheme requirements.