Independent UK planning guide

Wet-room installation costs in the UK

Create a tanked, level-access shower room with suitable falls, drainage and slip-resistant finishes.

Get site-specific quotes

Typical UK range

£7,000–£15,000

Straightforward jobs

From £5,000

Typical site time

2–3 weeks

Build the allowance

How to read this price

Starting allowance

For a straightforward, accessible job with a standard specification.

From £5,000

Typical UK project

An early planning range before a tradesperson inspects the property.

£7,000–£15,000

Likely programme

Site time varies with preparation, sequencing, approvals and drying periods.

2–3 weeks

These figures are early UK planning allowances. They are not a substitute for an itemised quotation after inspection.

Control the variables

What can change the quote?

1

Pipe and soil-stack alterations

2

Tiling area and tile format

3

Waterproofing and subfloor condition

4

Sanitaryware and brassware specification

Before accepting a quote

Ask for these details in writing

  • Labour, materials and VAT
  • Preparation and protection
  • Access equipment and waste
  • Named provisional allowances
  • Testing and certification
  • Programme and payment stages
  • Making good and decoration
  • Warranty and snagging process

Related bathrooms jobs