Roof repair costs in the UK

Diagnose and repair local slipped coverings, failed flashings or storm damage.

Get site-specific quotes

Typical UK range

£250–£1,500

Straightforward jobs

From £180

Typical site time

Half–2 days

Build the allowance

How to read this price

Starting allowance

For a straightforward, accessible job with a standard specification.

From £180

Typical UK project

An early planning range before a tradesperson inspects the property.

£250–£1,500

Likely programme

Site time varies with preparation, sequencing, approvals and drying periods.

Half–2 days

These figures are early UK planning allowances. They are not a substitute for an itemised quotation after inspection.

Control the variables

What can change the quote?

1

Roof size, pitch and complexity

2

Tile, slate or membrane specification

3

Scaffold, permits and access

4

Timber, chimney and leadwork repairs

Before accepting a quote

Ask for these details in writing

  • Labour, materials and VAT
  • Preparation and protection
  • Access equipment and waste
  • Named provisional allowances
  • Testing and certification
  • Programme and payment stages
  • Making good and decoration
  • Warranty and snagging process