Independent UK planning guide

Kitchen tiling costs in the UK

Tile a splashback or kitchen floor with the preparation, trims, grout and sealing the finish needs.

Get site-specific quotes

Typical UK range

£450–£1,800

Straightforward jobs

From £300

Typical site time

1–4 days

Build the allowance

How to read this price

Starting allowance

For a straightforward, accessible job with a standard specification.

From £300

Typical UK project

An early planning range before a tradesperson inspects the property.

£450–£1,800

Likely programme

Site time varies with preparation, sequencing, approvals and drying periods.

1–4 days

These figures are early UK planning allowances. They are not a substitute for an itemised quotation after inspection.

Control the variables

What can change the quote?

1

Cabinet count and construction

2

Worktop material and templating

3

Gas, electrical and plumbing moves

4

Flooring, plastering and decoration

Before accepting a quote

Ask for these details in writing

  • Labour, materials and VAT
  • Preparation and protection
  • Access equipment and waste
  • Named provisional allowances
  • Testing and certification
  • Programme and payment stages
  • Making good and decoration
  • Warranty and snagging process

Related kitchens jobs